Chematek
ÉTUDES DE CAS

Exemples de projets

PARTENAIRES MONDIAUX

Tant de clients. Tant de projets différents.

Notre capacité à établir des relations solides avec nos clients est au cœur de notre succès depuis nos débuts, il y a plus de 40 ans.

Nous avons collaboré avec certaines des plus grandes entreprises industrielles du monde. Nous avons également accompagné des sociétés qui débutaient et cherchaient encore leur voie. Grandes ou petites, les entreprises font appel à nous parce qu'elles savent que nous sommes en mesure de fournir les produits et les services dont elles ont besoin.

Projets sélectionnés

Case study18 Nov 2025Chematek Awarded FESR Grant for Sustainable COFREE – CARB Project

Chematek has been awarded funding for the COFREE – CARB project within the framework of the European Regional Development Fund Programme FESR 2021–2027 of Regione Lombardia, under Action 1.1.2 “Support to technological transfer between Research and Lombardy companies”.

Chematek Research Published in ACS Organic Process Research & DevelopmentCase study8 Oct 2024Chematek Research Published in ACS Organic Process Research & Development

Chematek is proud to announce the publication of a significant research paper in *Organic Process Research & Development*, a leading peer-reviewed journal published by the American Chemical Society. The paper presents a comprehensive review of Synhydrid chemically known as Sodium bis(2-methoxyethoxy)aluminium hydride, or SDMA one of Chematek's flagship organometallic reducing agents. This publication marks a major scientific milestone for the company, representing the culmination of years of research into a reagent that Chematek has championed as a safer, more efficient alternative to traditional reducing agents.

Water Treatment System for SK EcoengineeringCase study13 Jun 2023Water Treatment System for SK Ecoengineering

SK Ecoengineering required a water treatment plant for a new factory in Poland manufacturing a lithium-based substrate, which is then supplied to another factory in Hungary producing automotive batteries.

Desalination plant for a 300MW Power PlantCase study24 May 2022Desalination plant for a 300MW Power Plant

Our client had a capacity of 300 MW and used Ion Exchange Resins (IER) technology and fresh water to produce ultra-pure demi water needed for high-pressure steam.

Des spécialistes de la résolution de problèmes et de la gestion de projets

Études de cas | Chematek - Industrial Chemical Solutions